
Vertical-Mounted Masts
Pneumatic (Non-Locking)
Pneumatic (Locking)
Screwdrive
• specifications
Specifications: Quick Erecting Antenna Masts (QEAM)
| Model | TM 6 | TM 10 | HDTM 10 | TM 15 |
| Nested Height | 5ft 7in/1.7m | 8ft/2.4m | 8ft/2.4m | 8ft/2.4m |
| Extended Height | 19ft 8in/6m | 32ft 10in/10m | 32ft 10in/10m | 50ft/15m |
| Guying | 2 level/3 way | 2 level/3 way | 2 level/3 way | 3 level/3 way |
| Number of Sections | 5 | 5 | 6 | 8 |
| Size/Shape | Round w/ full length key | Round w/ full length key | Round w/ 2 full length keys | Round w/ 2 full length keys |
| Material | Aluminum 6061-T6 | Aluminum 6061-T6 | Aluminum 6061-T6 | Aluminum 6061-T6 |
| Weight (mast only) | 30lb/14kg | 42lb/19kg | 110lb/50kg | 135lb/61kg |
| Weight (accessory kit) | 51lb/23kg | 57lb/26kg | 57lb/26kg | 77lb/35kg |
| Payload capacity | 15lb/7kg | 15lb/7kg | 75lb/34kg | 75lb/34kg |
| Max. sail area | 6sqft/0.6msq CD=1.5 | 6sqft/0.6msq CD=1.5 | 6sqft/0.6msq CD=1.5 | 6sqft/0.6msq CD=1.5 |
| Ice load | 0.5in/12mm | 0.5in/12mm | 0.5in/12mm | 0.5in/12mm |
| Max. erection wind * | 25mph/40kph | 25mph/40kph | 25mph/40kph | 25mph/40kph |
| Operational wind | 60mph/97kph | 60mph/97kph | 60mph/97kph | 60mph/97kph |
| Survival wind | 80mph/128kph | 80mph/128kph | 80mph/128kph | 80mph/128kph |
| Operational stability | ±15° | ±15° | ±15° | ±15° |
| Deployment time | 2 persons, 7.5 min | 2 persons, 7.5 min | 3 persons, 8 min | 3 persons, 10 min |
| Deployment time | 1 person, 15 min | 1 person, 15 min | 3 person, 8 min | 3 person, 10 min |
| Drive system | Screw drive with manual crank | Screw drive with manual crank | Screw drive with manual crank | Screw drive with manual crank |
| Finish | Mil-F-10472, AG | Mil-F-10472, AG | Mil-A-8625 Type III, CL 2 Black | Mil-A-8625 Type III, CL 2 Black |
* Note: Must be guyed for wind speeds over 25 mph/40 kph.
| TM 10 (AB-1386/U) QEAM ™ MIL Spec Qualifications | |
| High Temperature to +68°C: MIL-STD-810E, Method 501.3, Procedure II | |
| Low Temperature to -51°C: MIL-STD-810E, Method 502.3, Procedure I and II | |
| Altitude: MIL-STD-810E, Method 500.3, Procedure I and II | |
| Humidity: MIL-STD-810E, Method 507.3, Procedure III | |
| Fungus: MIL-STD-810E, Method 508.4 | |
| Salt Fog: MIL-STD-810E, Method 509.3 | |
| Sand and Dust: MIL-STD-810E, Method 510.2, Procedure I and II | |
| Vibration, Loose Cargo Transport: MIL-STD-810E, Method 514.4, Para 1-3.2.3, Category 3, Procedure II | |
| Shock, Transit Drop: MIL-STD-810E, Method 516.4, Procedure IV | |
| Vibration, Ground Mobile: MIL-STD-810E, Method 514.4, Category 8, Table 1 | |
| Ice Load: MIL-STD-810E, Method 521.1 | |
| Rain: MIL-STD-810E, Method 506.3, Procedure I | |
| Immersion: MIL-STD-810E, Method 512.3, Procedure I | |
| Human Engineering: MIL-STD-1472 | |
Specifications subject to change without notice.
For more information contact_us@willburt.com
